
Add to Cart
80W 6090 Leather CO2 Laser Engraving Cutting Machine With LCD Control Water Cooling
1.Product Advantage :
1. Advanced DSP Digital Control technology and Integrated Frame Structure to ensure Work Stability.
2. Imported Reflected Lens and ZnSe focus lens in the Optical System Can greatly Reduce the heat loss.
3. High Quality CO2 Glass Sealed Laser tube Provides Strong Stable Laser beam mode and Longer Service Life.
4. Original Imported Straight Linear Guide Rail X. Y axis running on a high Speed and Precision.
5.Red light positioning device can accurately indicates the location of the processing of the laser head.
6. Having the function of recovering carving-point after power-outage .
7. Intelligent processing cross-boarder protection function can prevent mechanical impact caused by
the designed documents.
2. Technical Parameter :
Cutting area | 600*900mm |
Laser tube power | 80w / 100W |
Laser type | CO2 sealed laser tube, water-cooled |
Cutting speed | 0-4000mm/min |
Laser output | 1-100%software setting |
Resetting positioning accuracy | <±0.01mm |
Power supply | AC110-220V±10%, 50-60Hz |
Operating humidity | 5-95% |
Min. Shaping character | English 1.0mm*1.0mm |
Graphic fonmat supported | BMP, PLT, DST, DXF |
Software supported | CorelDraw, Photoshot, AutoCAD |
Driving system | Stepper motor |
Cooling mode | Water pump |
3. Main Structure :
1. USB port transfer files
2. Newest laser work software
3. imported focus lens
4. laser tube power is 60W ( optional)
5. optional up and down worktable
6. machine's front and back door can open
7. water cooling system CW3000
4. Services :
1.Offering the specification for the machine,two years warranty.
2.English software,user manual and operation video
3.24 hours technical support by email,calling,if you have any problems,we will within 12 hours to solve it.
4.During the warranty period,if any part is broken,we will provide for free.
5,Support engineer come to your country for training.
6.Packing: Plywood case export standard package
7.Shipment time: Within 7 working days after receive the payment.in the meanwhile,we will report the
production process in time.
5. Sample Show :